Regime 56, Building 3
262 S. Sea Pines Dr.
Hilton head Island, SC 29928
06/18/2010 Update:
Balcony handrail replacement on building #3 complete, two screened-in porches and one awning removed. Paint touch-up work in progress and should be finished by the end of business day on Friday, June 18-th, 2010
06/15/2010 Update:
Balcony Handrail replacement in progress at units 1730 & 1744. Fabric awning removed from balcony of unit 1744 per ASI request.
Balcony handrail replacement finished at units 1731 & 1745;
Balcony Handrail Replacement in progress at units 1733 & 1743; Screen porch structure removed from balcony of unit 1743 per Regime 56 request. Screen porch structure removed from porch of unit 1725 per Regime request.
Balcony handrail installation finished at units 1732 & 1742;
06/11/2010 Update:
Balcony handrail replacement in progress on units 1732, 1742 & 1733;
Existing Balcony handrails on unit 1732 and 1742:
06/10/2010 Handrail Replacement Update: New Handrails for building #3 were delivered to Bluff Villas on Thursday, June 10/2010. All handrails inspected by Charlie Walczak and Valdas Stankevicius and aproved for installation. Handrail replacement work will start on Friday, June 11, 2010.
06/07/2020 Handrail Replacement: Due to some technical dificulties with fabrication of handrails, installation was delayed untill June 10, 2010. For updated project schedules please use a link on the right side menu to "Maintenance Calendar".
04/20/2010 Aluminum laders installation on the flat roof. Building #3
Left side heat pump deck:
Right side heat pump deck:
12/20/2009 Final picture of the flat roof deck. Building #3
Final pictures of the flat roof deck on the left side of building #3
Final pictures of the flat roof deck on the right side of building #3
12/10/2009 Moisture damage repair to the flat roof deck on the left side of building #3
Install new pressure treated rim board and 2x8 joists with HD galvanized joist hangers (in compliance with IBC2006 code). Apply pressure treated CDX roof plywood.
Remove and dispose of roof membrane over the damaged flat roof deck area on the left side of building 3. Remove and dispose of plywood, joists and rim board.
|