New Door Locks

Your old door lock has been replaced with new Powerbolt 1000 Keyless Home Access System. If you would like get back old keys contact Erica at Island Regime (843) 785-9223 . For new keys or electronic lock code call Euro Construction Inc. (843) 682-3876 .

Here you can read Powerbolt Lock Owner's Manual

Short instructions:

  1. Push the Lock button on outside touch pad to extend latch bolt 1" which locks the door when you leave.
  2. Enter your desired personal code to retract the latch bolt completely witch unlocks the door when you return home.
  3. The T-turn on the side of the door is used to extend(lock) or retract (unlock) the latch bol when you are inside
  4. Using the key from the outside will also extend (lock) or retract (unlock) the latch bolt

Note: If several attempts were needed to set your security codes - you may have activated the worning sound. Wait 1 minute for the unit to be operational again.

In case of emergency please call those numbers:

  • (843) 298-0823
  • (843) 298-0826
  • (843) 298-1838
  • (843) 298-3511

Interior Renovation

If you going to employ contractors for interior renovation by your self, you should get building permit which has to be attached to the front door, you have to rent your own trash container and can't use Euro Construction's one, all renovation work has to be coordinated with Euro Construction Inc. by phone (843) 682-3876 or e-mail - This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

Services

If you would like to renovate your apartments we can offer wide range of services and renovation work management. More about those services you can read in At Your Service area ore call us by phone (843) 682-3876 or e-mail to This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

 

Owners/Tenants

We will try to make our work as little inconvenient to your renters as we can. It would be better to let them know ahead of time about all the work being done and about our schedules, so they would be better prepared. On our website we are seeking to provide you the most recent information from construction site. Here you can find current and future work schedule, construction updates with finished work and images of work progress. Please check Work Schedule regulary. We will coordinate door and window installation with your renters and will keep your villa accessible at all times. During windows and doors replacement we'll try to protect your floors and countertops as best as we can by covering them. Euro Construction Inc. is not responsible for windows/doors treatments. We recomend owners who has expensive custom treatments to remove them before replacement work starts. During construction work at certain building, all parking spaces in front of this building will be used for materials and dumpster. While renovating stairs we’ll make temporary steps to reach appartment safely. Tenants should take care of children and don’t let them go without supervising.

 

Home arrow Projects arrow Previous Projects arrow Tanglewood Villas arrow Building 500

July 31, 2007 Construction Update

  • Exterioir carpet has been installed
  • Villa numbers and restriction signs installation in progress
  • Final painting tuchups will be finished on Friday
  • Exterior wall scounces will be installed on Friday 

p1010022.jpg

p1010018.jpg

p1010019_copy.jpg

p1010021.jpg

p1010024_copy.jpg

p1010027.jpg

April 26, 2007 Construction Update

  • Building 500 renovation work completed
  • Lightening installation will start after approval
  • Painting work will start after color scheme approval

p1010009_copy.jpg

 

April 14, 2007 Construction Update

  • Renovation work on Building 500 is almost complete. New soffit panels and fascia trim is installed on front side of the roof, all windows and entry doors trimed. Bike storage fences have been rebuilt wirh new pressure treated wood framing and KLEER PVC vertical t&g siding. Old TRT 2x6 wood floring at entry stairwels and landings have been replaced with new, Composite, TREX decking boards (Same as rear decks). Old diagonal cypress siding on second floor walkway guard rails and stairwell guard rails, gave been replaced with new, vertical KLEER PVC 1x6 T&G siding.

 

20070413_tnglbld05_03.jpg

  • New, pressure treated wood handrails installed at the entry landings by Units 501 & 502. KLEER PVC Corner trim and horizontal Hardiplank lap siding installed on all front side walls of building 500. Siding and trim work on building 500 Should be comletelly finished on Monday, April 16, 2007.

20070413_tnglbld05_04.jpg

March 30,2007 Construction Update

  • Rear side of Building 500 completed. All windows and sliding patio doors replaced, all deck/balconie framing and flooring finished, handrails, trim and siding installed. Rough-in framing inspection passed.

20070330TNGLW4B04.jpg

  • Siding removal and wood rot repairs finished on the front side of building 500. New windows and front entry doors installed and trimed

20070330TNGLW04.jpg

  • Front steps and bike storage fence rebuilt for unit 501.

20070330TNGLW01.jpg

  • Same work in progress by unit 502.

20070330TNGLW.jpg

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

March 19, 2007 Construction update

  • Building 500 side wall siding installation will be finished today.
  • Building 500 front side siding remove, wood rot repair.
  • Building 500 front side second floor windows and door replacement, triming.
  • Building 500 service yard fencies reconstruction

March 15, 2007 Construction update

  • Front side first floor windows and front door replaced and trimed.
  • Front side corner installed.
  • Building 500 front side siding remove, wood rot repair in progress.
  • Building 500 side wall siding installation in progress.

p1010002_copy.jpg

p1010003.jpg

p1010004_copy.jpg

 

 

March 12, 2007 Construction update

  • Building 500 front side siding remove, wood rot repair.
  • Tyvek Home Wrap installation
  • Front side first floor windows and front door replacement

March 09, 2007 Construction update

  • Building 500 rear side has been finished

p1010520.jpg

 

March 06, 2007 Construction update

  • 503 & 501 units rear side wall siding will be finished today
  • Street side wall framing rot repared, plywood changed, coated with Tyvek Home Wrap
  • Street side wall windows has been changed
  • 502, 504, 505 & 506 units deck floors & railings has been installed
  • Installing 501 & 503 units deck floors & railings
  • Starting sidind installation on street side wall tomorow

p1010001.jpg

p1010002.jpg

p1010004.jpg

 

 

February 23, 2007 Construction update

  • All units rear side windows and sliding doors has been changed, flashed and trimed.
  • All rear decks framing using Simpson "strong tie" connectors on first and second floors has been built.
  • 506 & 502 units rear wall siding finished.
  • Rear side midle wall siding will be finished today.
  • Preparing for 503 & 501 units rear wall siding work.

P2230032.jpg

P2230035.jpgP2230037.jpgP2230039.jpg

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

January 31, 2007 Construction update

 

  • Old woot siding and trim removed from rear side walls;
  • All rear decks first and second floor removed and disposed;
  • Wood rot repairs in rear wall framing finished;
  • Wall insulation and anchors checked, new TRT CDX & OSB wall sheating installed on rear walls;
  • Tyvek Home Wrapinstalled on the rear side walls;
  • Fascia trim and soffit panel replacement in progress.Wood rot repairs in roof overhang framing finished;
  • Deck framing in progress for villas 501 & 502;