New Door Locks

Your old door lock has been replaced with new Powerbolt 1000 Keyless Home Access System. If you would like get back old keys contact Erica at Island Regime (843) 785-9223 . For new keys or electronic lock code call Euro Construction Inc. (843) 682-3876 .

Here you can read Powerbolt Lock Owner's Manual

Short instructions:

  1. Push the Lock button on outside touch pad to extend latch bolt 1" which locks the door when you leave.
  2. Enter your desired personal code to retract the latch bolt completely witch unlocks the door when you return home.
  3. The T-turn on the side of the door is used to extend(lock) or retract (unlock) the latch bol when you are inside
  4. Using the key from the outside will also extend (lock) or retract (unlock) the latch bolt

Note: If several attempts were needed to set your security codes - you may have activated the worning sound. Wait 1 minute for the unit to be operational again.

In case of emergency please call those numbers:

  • (843) 298-0823
  • (843) 298-0826
  • (843) 298-1838
  • (843) 298-3511

Interior Renovation

If you going to employ contractors for interior renovation by your self, you should get building permit which has to be attached to the front door, you have to rent your own trash container and can't use Euro Construction's one, all renovation work has to be coordinated with Euro Construction Inc. by phone (843) 682-3876 or e-mail - This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

Services

If you would like to renovate your apartments we can offer wide range of services and renovation work management. More about those services you can read in At Your Service area ore call us by phone (843) 682-3876 or e-mail to This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

 

Owners/Tenants

We will try to make our work as little inconvenient to your renters as we can. It would be better to let them know ahead of time about all the work being done and about our schedules, so they would be better prepared. On our website we are seeking to provide you the most recent information from construction site. Here you can find current and future work schedule, construction updates with finished work and images of work progress. Please check Work Schedule regulary. We will coordinate door and window installation with your renters and will keep your villa accessible at all times. During windows and doors replacement we'll try to protect your floors and countertops as best as we can by covering them. Euro Construction Inc. is not responsible for windows/doors treatments. We recomend owners who has expensive custom treatments to remove them before replacement work starts. During construction work at certain building, all parking spaces in front of this building will be used for materials and dumpster. While renovating stairs we’ll make temporary steps to reach appartment safely. Tenants should take care of children and don’t let them go without supervising.

 

Home arrow Projects arrow Previous Projects arrow Tanglewood Villas arrow Building 400

July 31, 2007 Construction Update

  • Exterioir carpet installation in progress
  • Villa numbers and restriction signs installation in progress
  • Final painting tuchups will be finished on Friday
  • Exterior wall scounces will be installed on Friday 

June 15, 2007 Construction Update

  • Rear side siding installation finished
  • Rear side windows and sliding door installation finished
  • Triming work finished
  • Balconies except 401 and 403 remodeling finished
  • 401 and 403 balconies remodeling in progress. Will be finished by June 19
  • All building #400 remodeling will be finished by June 19
  • Building #300 remodeling work started

P1010121.jpg

P1010122.jpg

P1010125.JPG

P1010126.jpg

June 04, 2007 Construction Update

  • Building #400 rear side of units 402 and 406, all windows has been replaced, hardiplank siding installed, window/door trim installed, corner trim installed.
  • Building #400 rear side second floor new sliding door installation in progress
  • Building #400 rear side all balcony decks framing finished.

 

P1010075.jpg

P1010076.jpg

P1010077.jpg

 

May 23, 2007 Construction Update

  • Unit 402 bicycle storage fence remodeling in progress
  • Building #400 left side wall windows has been replaced with new ones
  • Building #400 left side wall new siding installation has started
  • Building #400 rear side first floor windows has been replaced with new ones
  • Unit 402 rear side deck new framing compleated
p1010068.jpg
p1010069.jpg
p1010070.jpg

May 18, 2007 Construction Update

  • Building #400 front side siding installation will be finished this week
  • Unit 401 stairs handrailing installed
  • Building #400 rear side first floor old siding removed
  • Inspecting for wood rot on building #400 rear side
  • Changing damaged construction elements with new ones. Reparing framing, changing plywood, installing Home Wrap Tyvek
  • 401, 403, 402, 406 units decks demolished

p1010057.jpg

p1010058.jpg

p1010059.jpgp1010060.jpg

p1010061.jpg

p1010062.jpg

May 15, 2007 Construction Update:

  • Second floor railing timing finished
  • Stairs to second floor triming finished
  • Siding installed on front of second and third floor
  • Stairs to unit 401 remodeled and conpleated
  • Removing siding, old plywood, inspecting for wood rot on building #400 left side wall.
  • Installing new plywood, Tywek Home Wrap on building #400 left side wall.
  • Preparing building #400 left side wall for windows changing

p1010050.jpg

p1010051.jpg

p1010053.jpg

p1010054.jpg

p1010056.jpg

May 10, 2007 Construction Update:

  • Second floor railing triming in progress
  • Stairs to second floor ready for triming
  • Maiking new stairs to 401 unit

p1010042.jpg

p1010043.jpg

p1010044.jpg

p1010045.jpg

May 9, 2007 Construction Update:

  • First & second floor siding installation finished
  • 401 bike storage fence finished

May 3, 2007 Construction Update:

  • Windows & door triming installation finished
  • Siding installation on 401 unit and 403 unit finished
  • Second floor railing triming in progress

p1010001_copy.jpg

April 26, 2007 Construction Update:

  • Old siding on the front side has been removed
  • Tyvek Home Wrap installed
  • Front side windows & door removed and replaced with new ones
  • Windows & door triming work has started
  • Safet installation on floors
  • 401 & 402 units first floor new deck floors installed
  • Right side wall siding installation finished

p1010007_copy.jpg

 

p1010011_copy.jpg

p1010012_copy.jpg

p1010013.jpg

p1010014.jpg

p1010016.jpg

p1010019.jpg

 

April 14, 2007 Construction Update:

 

  • Old cypress siding removal is in progress on the front side of Building 400. Bike storage fences have been removed. Entry landing an stairwell handrails removed and disposed. Front side window and entry door replacement should start after Monday, April 16, 2007. During next three weeks, access to units 401-406 will not meet safety standards during work hours. We strongly recommend all home owners and/or tenants to limit/cancel condo usage, or be extremely careful when entering/exiting your condo. Please do not let small children to be on the project site withour parent supervision.

20070413_tnglbld04_02.jpg

 

March 30, 2007 Construction Note:

 

Siding remowal on the front side of building 400 is scheduled to start on or after April 02, 2007

Existing look of the building as of March 30, 2007:

 

Front side elevation

 

20070330TNGLW4B01.jpg

Left Side Elevation

20070330TNGLW4B02.jpg

Rear Side Elevation

 

20070330TNGLW4B03.jpg

 

 

 