New Door Locks

Your old door lock has been replaced with new Powerbolt 1000 Keyless Home Access System. If you would like get back old keys contact Erica at Island Regime (843) 785-9223 . For new keys or electronic lock code call Euro Construction Inc. (843) 682-3876 .

Here you can read Powerbolt Lock Owner's Manual

Short instructions:

  1. Push the Lock button on outside touch pad to extend latch bolt 1" which locks the door when you leave.
  2. Enter your desired personal code to retract the latch bolt completely witch unlocks the door when you return home.
  3. The T-turn on the side of the door is used to extend(lock) or retract (unlock) the latch bol when you are inside
  4. Using the key from the outside will also extend (lock) or retract (unlock) the latch bolt

Note: If several attempts were needed to set your security codes - you may have activated the worning sound. Wait 1 minute for the unit to be operational again.

In case of emergency please call those numbers:

  • (843) 298-0823
  • (843) 298-0826
  • (843) 298-1838
  • (843) 298-3511

Interior Renovation

If you going to employ contractors for interior renovation by your self, you should get building permit which has to be attached to the front door, you have to rent your own trash container and can't use Euro Construction's one, all renovation work has to be coordinated with Euro Construction Inc. by phone (843) 682-3876 or e-mail - This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

Services

If you would like to renovate your apartments we can offer wide range of services and renovation work management. More about those services you can read in At Your Service area ore call us by phone (843) 682-3876 or e-mail to This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

 

Owners/Tenants

We will try to make our work as little inconvenient to your renters as we can. It would be better to let them know ahead of time about all the work being done and about our schedules, so they would be better prepared. On our website we are seeking to provide you the most recent information from construction site. Here you can find current and future work schedule, construction updates with finished work and images of work progress. Please check Work Schedule regulary. We will coordinate door and window installation with your renters and will keep your villa accessible at all times. During windows and doors replacement we'll try to protect your floors and countertops as best as we can by covering them. Euro Construction Inc. is not responsible for windows/doors treatments. We recomend owners who has expensive custom treatments to remove them before replacement work starts. During construction work at certain building, all parking spaces in front of this building will be used for materials and dumpster. While renovating stairs we’ll make temporary steps to reach appartment safely. Tenants should take care of children and don’t let them go without supervising.

 

Home arrow Projects arrow Previous Projects arrow Tanglewood Villas arrow Building 300

July 27, 2007 Construction update:

  • Building #300 rear side unit 306 sliding doors has been changed.
  • Unit 302 & 306 rear side siding installation in progress
  • Unit 302 & 306 rear side balconies new railing & deckdesks installation in progres
  • Building #300 right side siding installation completed
  • Unit 302 bicycle storage fence completed. Steps and railing installation in progress
  • Railing of stairs to second floor and second floor railing trim installation completed
  • Front side second floor siding installation should be finished today 

P1010213.jpg

P1010214.jpg

 

P1010215.jpg

P1010216.jpg

P1010221.jpg

P1010222.jpg

P1010224.jpg

July 19, 2007 Construction update:

  • Building 300 side wall new siding installation finished
  • All new windows and front doors installed
  • All front old siding removed. Framing checked for wood rot and fixed were needed
  • All windows and doors flashed and trimmed
  • Units 301 & 302 deck boards installed
  • Stairs to second floor rebuilted. New steps installed. Ready for railing trimming.
  • Building 300 rear side balconies completed except unit 301 & 306
  • Front side second floor coridor railing trimming started
  • New soffit panel installation in progress

P1010182.jpg

P1010183.jpg

P1010185.jpg

P1010185.jpg

P1010186.jpg

P1010187.jpg

P1010187.jpg

P1010190.jpg

July 09, 2007 Construction update:

  • Rear side first and second floor new siding installed
  • Rear side windows and sliding doors changed
  • Unit 303 rear side balcony railing installed
  • Building #300 side wall new plywood and Tyvek Home Wrap installed and ready for new siding, new windows, new louvre window installation
  • Front side demolution work started
  • New front windows on 302 and 306 units installed

P1010170.jpg

P1010171.jpg

P1010172.jpg

P1010173.jpg

P1010175.jpg

 

June 29, 2007 Construction update:

  • Rear side corners trimed
  • Rear side siding installation started
  • All baconies framing done
  • Rear side first floor all windows and sliding door changed
  • Rear side second and third floor windows and sliding door changing in progress

P1010165.jpg

P1010166.jpg

P1010167.jpg

P1010168.jpg

June 22, 2007 Construction update:

  • Rear side remodeling work started
  • Materials, trash container, utility unit moved to building #300
  • Removed old siding on rear side
  • Old balconies demolished
  • Framing inspected for wood rot. Damaged parts of framing replaced with new ones.
  • Instaling new plywood and Tyvek Home Wrap
  • Building new framing of balconies.
  • Next Tuesday, June 26 new window delivery and installation start

P1010127.jpg

P1010128.jpg

P1010136.jpg

 

06/11/2007:

Scheduled start of demolition - June 14, 2007. Demolition work will start on the rear side of building # 300 at unit # 301 and will proceed around the building.

Note To Owners:

Please remove all personal belongings for your Porch/Balcony. EURO Construction will not be responsible for missing/misplaced items left in the porches or hanging on exterior walls.

 