New Door Locks

Your old door lock has been replaced with new Powerbolt 1000 Keyless Home Access System. If you would like get back old keys contact Erica at Island Regime (843) 785-9223 . For new keys or electronic lock code call Euro Construction Inc. (843) 682-3876 .

Here you can read Powerbolt Lock Owner's Manual

Short instructions:

  1. Push the Lock button on outside touch pad to extend latch bolt 1" which locks the door when you leave.
  2. Enter your desired personal code to retract the latch bolt completely witch unlocks the door when you return home.
  3. The T-turn on the side of the door is used to extend(lock) or retract (unlock) the latch bol when you are inside
  4. Using the key from the outside will also extend (lock) or retract (unlock) the latch bolt

Note: If several attempts were needed to set your security codes - you may have activated the worning sound. Wait 1 minute for the unit to be operational again.

In case of emergency please call those numbers:

  • (843) 298-0823
  • (843) 298-0826
  • (843) 298-1838
  • (843) 298-3511

Interior Renovation

If you going to employ contractors for interior renovation by your self, you should get building permit which has to be attached to the front door, you have to rent your own trash container and can't use Euro Construction's one, all renovation work has to be coordinated with Euro Construction Inc. by phone (843) 682-3876 or e-mail - This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

Services

If you would like to renovate your apartments we can offer wide range of services and renovation work management. More about those services you can read in At Your Service area ore call us by phone (843) 682-3876 or e-mail to This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

 

Owners/Tenants

We will try to make our work as little inconvenient to your renters as we can. It would be better to let them know ahead of time about all the work being done and about our schedules, so they would be better prepared. On our website we are seeking to provide you the most recent information from construction site. Here you can find current and future work schedule, construction updates with finished work and images of work progress. Please check Work Schedule regulary. We will coordinate door and window installation with your renters and will keep your villa accessible at all times. During windows and doors replacement we'll try to protect your floors and countertops as best as we can by covering them. Euro Construction Inc. is not responsible for windows/doors treatments. We recomend owners who has expensive custom treatments to remove them before replacement work starts. During construction work at certain building, all parking spaces in front of this building will be used for materials and dumpster. While renovating stairs we’ll make temporary steps to reach appartment safely. Tenants should take care of children and don’t let them go without supervising.

 

Home arrow Projects arrow Previous Projects arrow Tanglewood Villas arrow Building 200

tgl200rearfinal.jpgBuilding #200 Final Pictures

 

tgl200frntfinal.jpg

P1010025.jpg

P1010026.jpg

 September 25, 2007 Construction Update

 

  • Siding replacement and wood rot repairs are finished on the rear side.
  • New windows and sliding patio doors installed for all 6 units in building 200.
  • All balconies rebuilt, Handrail installation at the final stages 

tgl200rearjpg.jpg 

tgl200side.jpg 

  •  Siding installation and wood rot repairs are finished on the front and right side of building 200.
  • Windows and new entry doors installed.
  • Interior trim installation in progress.
  • Entry stairs and bike storage fences finished
  • Acrylic caulk application in progress on the front elevation

tgl200frnt.jpg

 

 

September 07, 2007 Construction update

  • Building #200 rear side all old siding has been removed.
  • Building #200 rear side making wood rot inspection. Repairing damaged framing, installing new plywood and Tyvek Home Wrap.
  • Building #200 rear new siding on unit 201 installed. Moving further with new siding installation to units 203 & 204.
  • Building #200 all new corners and windows' trims installed on side wall.
  • Building #200 new siding installed on 3/4 of side wall.
  • A/C unit fence installed
  • Unit 201 bicycle storage fence finished
  • Unit 201 stair railings will be finished today 

 

P1010365.jpg

P1010367.jpg

P1010368.jpg

P1010370.jpg

August 30, 2007 Construction update

  • Left side wall all old siding removed.
  • New windows installed on left side wall
  • Front side siding will be finished today
  • Rear side #201 unit sliding door will be changed today
  • First and second floor new balconies framing constructed
  • Unit 202 front stairs railing completed

 

P1010352.jpg

P1010353.jpg

 

P1010355.jpg

P1010354.jpg

August 27, 2007 Construction update

  • Front side siding installation almost finished
  • Stairway railing trimmed
  • Unit 202 bike yard fence finished
  • Unit 202 railing installation in progress
  • Building #200 left side and rear side wall renovation started.
  • Removing old siding boards, inspecting plywood, construction framing for wood rot.
  • Fixing damaged framing, installing new plywood and covering with Tyvek Home Wrap.
  • Installing new windows and sliding doors on first floor.
  • Demolishing first floor balconies

 

P1010308.jpg

P1010309.jpg

P1010310.jpg

P1010311.jpg

P1010312.jpg

P1010313.jpg

P1010314.jpg

P1010316.jpg

P1010317.jpg

 

August 17, 2007 Construction update

 

  • Front side new siding installation started. Building's front right side and first floor siding installation completed.
  • Stairs to second floor reconstructed
  • Stair trimming and railing trimming in progress
  • New safet installation on first and second floor finished
  • Unit 201 and 202 entrance deck floor desks changed.
  • Windows and doors flashing and trimming finished

P1010269.jpg

 

P1010270.jpg

P1010271.jpg

P1010272.jpg

P1010278.jpg

 

August 08, 2007 Construction update

  • Building #200 front old siding removing in progress
  • Removing wall sheetrock covering
  • Making inspection for framing wood rot
  • Installing new plywood and Tyvek Home Wrap
  • Replacing front door and windows
  • Installing flashing around doors and windows
  • Old railigs removed from stairway
  • Ceiling safet removing
  • Next week will start unit 201 and 203 old siding removing and windows changing new railing installation

 

 

P1010228.jpg

P1010229.jpg

P1010230.jpg

P1010231.jpg

P1010232.jpg

P1010233.jpg

 





Lost Password?