New Door Locks

Your old door lock has been replaced with new Powerbolt 1000 Keyless Home Access System. If you would like get back old keys contact Erica at Island Regime (843) 785-9223 . For new keys or electronic lock code call Euro Construction Inc. (843) 682-3876 .

Here you can read Powerbolt Lock Owner's Manual

Short instructions:

  1. Push the Lock button on outside touch pad to extend latch bolt 1" which locks the door when you leave.
  2. Enter your desired personal code to retract the latch bolt completely witch unlocks the door when you return home.
  3. The T-turn on the side of the door is used to extend(lock) or retract (unlock) the latch bol when you are inside
  4. Using the key from the outside will also extend (lock) or retract (unlock) the latch bolt

Note: If several attempts were needed to set your security codes - you may have activated the worning sound. Wait 1 minute for the unit to be operational again.

In case of emergency please call those numbers:

  • (843) 298-0823
  • (843) 298-0826
  • (843) 298-1838
  • (843) 298-3511

Interior Renovation

If you going to employ contractors for interior renovation by your self, you should get building permit which has to be attached to the front door, you have to rent your own trash container and can't use Euro Construction's one, all renovation work has to be coordinated with Euro Construction Inc. by phone (843) 682-3876 or e-mail - This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

Services

If you would like to renovate your apartments we can offer wide range of services and renovation work management. More about those services you can read in At Your Service area ore call us by phone (843) 682-3876 or e-mail to This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

 

Owners/Tenants

We will try to make our work as little inconvenient to your renters as we can. It would be better to let them know ahead of time about all the work being done and about our schedules, so they would be better prepared. On our website we are seeking to provide you the most recent information from construction site. Here you can find current and future work schedule, construction updates with finished work and images of work progress. Please check Work Schedule regulary. We will coordinate door and window installation with your renters and will keep your villa accessible at all times. During windows and doors replacement we'll try to protect your floors and countertops as best as we can by covering them. Euro Construction Inc. is not responsible for windows/doors treatments. We recomend owners who has expensive custom treatments to remove them before replacement work starts. During construction work at certain building, all parking spaces in front of this building will be used for materials and dumpster. While renovating stairs we’ll make temporary steps to reach appartment safely. Tenants should take care of children and don’t let them go without supervising.

 

Home arrow Projects arrow Previous Projects arrow Tanglewood Villas arrow Building 600

    

Front side elevation view of building 600. Wood rot repair and new siding installation is finished. All windows and doors installed. Front entry stairs are being rebuild for units #601 and #602. Siding installation on second service yard in progress. Exterior paint work on Building 600 should start on December 26, 2007. Attention Home Owners/Tenants ! Please, do not park your vechicles in front of Building 600 during exterior paint work.

Interior trim installation on windows and new doors is currently in progress on Building 600. Any Villa Owners, that are planning to visit their unit during holiday weeks, please let us know by sending e-mail to This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

      December 28 Update 

20071228_front.jpg

 

       December 19 Update 

20071219 TnglBld6Frnt.jpg

Left side elevation view of Building 600.  New windows installed. Siding and trim installation complete.

20071219_tnglbld6lsd.jpg

Rear Side elevation view of Building 600. All new windows and sliding patio doors installed on the rear side. New, pressure treated wood decks build with "TREX" 5/4x6" flooring. New siding and trim board installation complete. Existing gutters and downspouts re installed. Ready for exterior paint.

20071219_tnglbld6rsd.jpg

 

 

 

 

  December 6 Update

Front side of building. The old siding is removed in most places. The front door is completle installed.

20071206_tnglvfrnt.jpg 

Rear side of building. The new windows and sliding door installed. Wood repairs, new siding and trim installation complete. Two balkonys rails installation is working on.

20071206_tnglvrear.jpg 

Two new windows installed. New attic vent installed. Wood repairs, new siding and trim installation is about complete.

20071206_tnglvlftside.jpg

              November 27 Update

 

     Right Side elevation view:

Two new windows installed. New attic vent installed. Wood repairs, new siding and trim installation complete.

20071127_tnglvd6rghtside.jpg 

     Rear side elevation view:

 Balcony demolition and wood rot repairs complete. Two new balconies completelly rebuilt. Siding installed on about 50% of rear wall area.

Gutter and downspout installed at unit 610. All windows and sliding doors replaced on the rear side. Siding and trim installation in progress on the middle and left side of the rear wall.

 

20071127_tnglvd6rearside.jpg

 

 

      Rear side elewation view:

View from building 800. All remaining balconies are framed. Soffit and fascia trim almost finished on the rear side of the roof. Windoe replacement in progress on the right side elevation wall.

20071127_tnglvd6rearside1.jpg

 

 

 

Left side elevation view:

Old siding removed up to third floor. Work in progress on replacing existing exterior sheathing (sheetrock) with new OCB plywood and performing wood rot repairs.

20071127_tnglvd6lftside.jpg 

 

          November 14 update

Front Side elevation view:

Old siding partially removed from right side front wall. Guard rail on second floor and main stairwell are being worked on. 

tnglbld600frnsddemo.jpg

 

Right side elevation view:

Old siding removed, damage repair finished, new windows installed on first and second floor; Ready for siding installation.

20071114_tngldbldg6_rside.jpg

 Rear side elevation view:

Old siding partially removed from wall surface;

Rear deck demolition/rebuild in progress;

20071114tnglbld600rearsddemo.jpg

                    November 05 Update

Siding removal in progress on the right side exterior wall of building 600.

20071105tnglvbldg6_rghtside.jpg 

 

______________________________________________________________________________            

                     Dear Villa Owners/Tenants,

 

     Renovation work on building 600 is scheduled to start on 11/1/2007.   Any villa Owners who have decided to have Light fixture installed in your balcony, please`contact EURO Construction Office A.S.A.P.

    All home owners and/or tenants shal use extra caution when entering and exiting building, also walking around stacked materials in parking lot. Please do not park your cars in front of building #100 during the work hours (7:00AM - 5:00PM).

     Please remove furniture, plants and other belongings from your balconies. We also recommend to remove any hanging objects from exterior walls (pictures, paintings, mirrors, etc.). Please Note, EURO Construction, Inc. will not assume responsibility for missing or misplaced belongings from your balcony.

     Thank you for your cooperation

_____________________________________________________________________________________________

Front Side Elevation Of Building 600  before renovation work

tgl600front.jpg

Right Side Elevation Of Building 600 before renovation work

tgl600right.jpg

Rear Side Elevation Of Building 600 before renovation work

tgl600rear.jpg

Left Side Elevation Of Building 600 before renovation work

tgl600left.jpg

 

***

 





Lost Password?