New Door Locks

Your old door lock has been replaced with new Powerbolt 1000 Keyless Home Access System. If you would like get back old keys contact Erica at Island Regime (843) 785-9223 . For new keys or electronic lock code call Euro Construction Inc. (843) 682-3876 .

Here you can read Powerbolt Lock Owner's Manual

Short instructions:

  1. Push the Lock button on outside touch pad to extend latch bolt 1" which locks the door when you leave.
  2. Enter your desired personal code to retract the latch bolt completely witch unlocks the door when you return home.
  3. The T-turn on the side of the door is used to extend(lock) or retract (unlock) the latch bol when you are inside
  4. Using the key from the outside will also extend (lock) or retract (unlock) the latch bolt

Note: If several attempts were needed to set your security codes - you may have activated the worning sound. Wait 1 minute for the unit to be operational again.

In case of emergency please call those numbers:

  • (843) 298-0823
  • (843) 298-0826
  • (843) 298-1838
  • (843) 298-3511

Interior Renovation

If you going to employ contractors for interior renovation by your self, you should get building permit which has to be attached to the front door, you have to rent your own trash container and can't use Euro Construction's one, all renovation work has to be coordinated with Euro Construction Inc. by phone (843) 682-3876 or e-mail - This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

Services

If you would like to renovate your apartments we can offer wide range of services and renovation work management. More about those services you can read in At Your Service area ore call us by phone (843) 682-3876 or e-mail to This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

 

Owners/Tenants

We will try to make our work as little inconvenient to your renters as we can. It would be better to let them know ahead of time about all the work being done and about our schedules, so they would be better prepared. On our website we are seeking to provide you the most recent information from construction site. Here you can find current and future work schedule, construction updates with finished work and images of work progress. Please check Work Schedule regulary. We will coordinate door and window installation with your renters and will keep your villa accessible at all times. During windows and doors replacement we'll try to protect your floors and countertops as best as we can by covering them. Euro Construction Inc. is not responsible for windows/doors treatments. We recomend owners who has expensive custom treatments to remove them before replacement work starts. During construction work at certain building, all parking spaces in front of this building will be used for materials and dumpster. While renovating stairs we’ll make temporary steps to reach appartment safely. Tenants should take care of children and don’t let them go without supervising.

 

Home arrow Projects arrow Previous Projects arrow Tanglewood Villas arrow Building 700
Tanglewood Building 700

     January 29 Update

Siding replacement and exterior trim work finished on building 700. New door and windows installed, New decks, landings and handrails built. New dryer vent and exost caps installed. Exterior paint is scheduled for the week of February 10, 2008. Aluminum grabrails should be installed after exterior paint. Carpet installation to be scheduled after all work and punch items completion.

Front elevation view:  The service yard fences in progress

20080129_front.jpg

Front elevation view:

20080129_front_1.jpg

     January 21 Update:

Front side of building 700: Windows ant Entry door is instaled. Begining of siding Installation.

20080121_front.jpg

Right side of building 700 is finished.

20080121_right_side.jpg

Rear side of building 700 is finished.

20080121_rear_side.jpg 

     January 14 Update:

Rear side elevation view: Balconies demolition and rot repairs complete. Two new balconies completely rebuild. Siding and corners is completely installed. All windows and sliding doors replaced on the rear side.

20080114_rear_side.jpg

 Right side elevation view. Begining of siding installation.

20080114_right_side.jpg

 20080114_front.jpgFront

 

      January 07 Update 

Building #700 front. Old siding removing in progress. Making inspection for framing wood rot. Installing new plywood and Tyvek Home Wrap. Replacing front door and windows. Installing flashing around doors and windows.  Old railigs removed from stairway.  

 20080104_front1.jpg

20080104_front.jpg

 Building #700 rear side. All old siding has been removed. Making wood rot inspection. Repairing damaged framing, installing new plywood and Tyvek Home Wrap. New Sliding door and windows - installed.

20080104_rear_side.jpg   

     December 28 Update

 Rear side elevation view:

Old siding partially removed from wall surface;

Rear deck demolition/rebuild in progress;

 20071228_rear.jpg

 

Right side elevation view:

Old siding removed, damage repair finished, new windows installed on first and second floor; Ready for siding installation.

20071228_right_side.jpg

 Old sidig removal in progress on the front side wall of Building 700   

20071228front.jpg

      Decembes 19 Update

 Rear side elevation view:

Old sidig removal in progress on the rear side wall of Building 700. Demolition of lower decks in progress. New windows and sliding patio doors delivered to project site. Please do not try to open sliding patio doors untill new door is installed and deck built by your unit. 

20071219_rear_side.jpg

 Right side elevation view: 

Old siding removed, damage repair finished. New windows are being installed on first and second floor: Ready for siding installation. All parking spaces in front of right side wall are closed. Please do not leave your vechicle by construction materials stacked in the parking lots at any time.

20071219_right_side.jpg

 

                     Dear Villa Owners/Tenants,

 

     Renovation work on building 700 is scheduled to start on 12/11/2007.   Any villa Owners who have decided to have Light fixture installed in your balcony, please`contact EURO Construction Office A.S.A.P.

    All home owners and/or tenants shall use extra caution when entering and exiting building, also walking around stacked materials in parking lot. Please do not park your cars in front of building #700 right side wall (by mail boxes) during the work hours (7:00AM - 5:00PM).

     Please remove furniture, plants and other belongings from your balconies and front entrance decks. We also recommend to remove any hanging objects from exterior walls (pictures, paintings, mirrors, etc.). Please Note, EURO Construction, Inc. will not assume responsibility for missing or misplaced belongings from your balcony or outside your front door.

     Thank you for your cooperation

 

 

 

Front Side Elevation of Building 700 before renovation work

20071206_front_side.jpg

Right side elevation of building 700 before renovation work    

 20071206_right_side.jpg

Rear side elevation of building 700 before renovation work

20071206_rear_side.jpg

 





Lost Password?