New Door Locks

Your old door lock has been replaced with new Powerbolt 1000 Keyless Home Access System. If you would like get back old keys contact Erica at Island Regime (843) 785-9223 . For new keys or electronic lock code call Euro Construction Inc. (843) 682-3876 .

Here you can read Powerbolt Lock Owner's Manual

Short instructions:

  1. Push the Lock button on outside touch pad to extend latch bolt 1" which locks the door when you leave.
  2. Enter your desired personal code to retract the latch bolt completely witch unlocks the door when you return home.
  3. The T-turn on the side of the door is used to extend(lock) or retract (unlock) the latch bol when you are inside
  4. Using the key from the outside will also extend (lock) or retract (unlock) the latch bolt

Note: If several attempts were needed to set your security codes - you may have activated the worning sound. Wait 1 minute for the unit to be operational again.

In case of emergency please call those numbers:

  • (843) 298-0823
  • (843) 298-0826
  • (843) 298-1838
  • (843) 298-3511

Interior Renovation

If you going to employ contractors for interior renovation by your self, you should get building permit which has to be attached to the front door, you have to rent your own trash container and can't use Euro Construction's one, all renovation work has to be coordinated with Euro Construction Inc. by phone (843) 682-3876 or e-mail - This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

Services

If you would like to renovate your apartments we can offer wide range of services and renovation work management. More about those services you can read in At Your Service area ore call us by phone (843) 682-3876 or e-mail to This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

 

Owners/Tenants

We will try to make our work as little inconvenient to your renters as we can. It would be better to let them know ahead of time about all the work being done and about our schedules, so they would be better prepared. On our website we are seeking to provide you the most recent information from construction site. Here you can find current and future work schedule, construction updates with finished work and images of work progress. Please check Work Schedule regulary. We will coordinate door and window installation with your renters and will keep your villa accessible at all times. During windows and doors replacement we'll try to protect your floors and countertops as best as we can by covering them. Euro Construction Inc. is not responsible for windows/doors treatments. We recomend owners who has expensive custom treatments to remove them before replacement work starts. During construction work at certain building, all parking spaces in front of this building will be used for materials and dumpster. While renovating stairs we’ll make temporary steps to reach appartment safely. Tenants should take care of children and don’t let them go without supervising.

 

Home arrow Projects arrow Previous Projects arrow Tanglewood Villas arrow Building 800

              March 11 Update: 

Left side elevation view of Building 800.  New windows installed. Siding and trim installation complete. 

20080317_left_side.jpg 

             Rear side elevation view:

 Balconies demolition and rot repairs complete. Siding and corners is completely installed. All windows and sliding doors replaced on the rear side.  

20080311_rear_side.jpg 

              February 26 Update:

      Renovation work on front of building 800 is almost finished. All windows and doors replaced, new siding and trim boards installed.  20080226_front.jpg

Rear side of building 800. Sliding door replacement in progress.

20080226_rear_side.jpg

Left  side of building 800. Siding installation in progress.

20080226_left_side.jpg

                  Febryary 15 Update:

 

Building a new balcony.

 

20080215_rear.jpg 

 

Building #800 front side. Old siding removed. Wall inspected for wood rot. New plywood and Tyvek Home Wrap installed. Entry door and windows already installed. Trim and siding installation work in progress.

20080215_front.jpg

       February 06 Update:

 

 Building 800 front. Old siding removing in progress. Making inspection for framing wood rot. Installing new plywood and Tyvek Home Wrap. Replacing front door and windows. Installing flashing around doors and windows.  Old railigs removed from stairway.

 

20080206_front.jpg 20080206_front_side.jpg

 

Left side elevation view:

Old siding removed; damage reppair finished; new windows and louver vent installed;Ready for siding and

 20080206_left_side.jpgtrimm installation.

Unit 801-803: Partial balkony demolition

20080206_rear_side.jpg

        January 29 Update:

Right side elevation view:

20080129_left_side.jpg

 

 

                     Dear Villa Owners/Tenants,

 

     Renovation work on building 800 is scheduled to start on 01/24/2008.   Any villa Owners who have decided to have Light fixture installed in your balcony, please`contact EURO Construction Office A.S.A.P.

    All home owners and/or tenants shall use extra caution when entering and exiting building, also walking around stacked materials in parking lot. Please do not park your cars in front of building #800 left side wall  during the work hours (7:00AM - 5:00PM).

     Please remove furniture, plants and other belongings from your balconies and front entrance decks. We also recommend to remove any hanging objects from exterior walls (pictures, paintings, mirrors, etc.). Please Note, EURO Construction, Inc. will not assume responsibility for missing or misplaced belongings from your balcony or outside your front door.

     Thank you for your cooperation !!!

 

 

 

Front side elevation view of Building 800 before renovation work.

20071219_tnglbld8frsd.jpg

Left side elevation view of Building 800 before renovation work.

20071219_tnglbld8rsd.jpg

Rear side elevation view before renovation work.

20071219_tnglbld8rearsd.jpg 

 

 