Construction of two new decks for units B-201 & B-301 complete. Ceiling panel installation and trim work in progress.
Rear side of building B. Balcony/porch floor structure of Unit B-301 was demolished, due to wood rot to the deck structure and joist overload with concrete slab.
Rear side of building B. Porch floor structure of unit B-201 was demoliched, due to minor wood rot to the deck structure and joist overload with concrete slab. New porch structure being built with pressure treated wood.
Demolition and repair work complete on the rear side of Units B-101, B-201 and B-301 exept wood rot repair in balcony and porch floor of Unit B-301. Master bedroom windows are being installed on the rear side.
Demolition and repair work complete on the left side of building B. Kitchen windows installation in progress for units B-101, B-201 and B-301.
Demolition and repair work complete on the front side of Units B-101, B-201 and B-301. front side bedroom windows being installed for units B-101, B-201 and B-301. Soffit and fascia trim installation almost complete, exept small area above front bedroom of Unit B-301, where wood rot repair required to subfascia and wall framing.
Demolition and repair work complete on front side of Units B-103, B-203, B-303. Windows replacesd, siding and trim installation complete. Roof shingle replacement complete. Paint work in progress.
Demolition and repair work complete on right side exterior wall of Units B-103, B-203, B-303. Windows replacesd, siding and trim installation complete. Roof shingle replacement complete. Paint work in progress.
Demolition and repair work complete on the rear side of units B-103, B-203 & B-303. Siding and trim installation almost complete on the rear side of units B-102, B-202 & B-302.
Demolition work begining on the rear side of units B-101, B-201 & B-301. Additional set of guard rails will be required for unit B-201 balcony. Siding installation in progress on chimney above unit B-202.
Siding and trim installation complete in exterior walkways on all three floors.
Window replacement and siding/trim installation complete on the front side of unit B-102, B-202 & B-302.
Aluminum bullnose installed on all stair risers. Waterproofing applied on all stairwells and landings.
Project work on Building B started on February 18, 2009. Demolition and repair work in progress on first, second and third floor walkways, front side of units B-103, B-203 and B-303.
Siding and trim removed on right side walls of units B-103, B-203 and B-303. Exterior sheathing removed. Ready for termite inspection.
Rear side elevation view of Units B-103, B-203 and B-303.
Rear side elevation view of Units B-102, B-202, B-302, B-101, B-201 and B-301.
Left side elevation view of units B-101, B-201 and B-301.
Front side elevation view of units B-101, B-201 and B-301.
Front side middle section view of Building B.
|